DDBC
試題分析:文章介紹了悉尼歌劇院的歷史和建設(shè)情況。
1.D 細(xì)節(jié)題。根據(jù)The Opera House with a sailing roof was designed by a famous Danish architect (丹麥建筑大師),Utzon.說明設(shè)計師來自丹麥,故D正確。
2.D 細(xì)節(jié)題。根據(jù)In 1962, the designs were finalized (定稿) and the construction began. In 1967, they started the decoration inside. It took 14 years in total to build the Opera House.說明悉尼歌劇院是從1962開始建到1967年建成,故D正確。
3.B 細(xì)節(jié)題。根據(jù)第二段1,2行The Sydney Opera House cost around $100 million and was paid for by the public 6,225 square meters of glass was used to build it.說明悉尼歌劇院的建設(shè)費(fèi)用是用公眾出的牢固B正確。
4.C 主旨大意題。文章介紹了悉尼歌劇院的歷史和建設(shè)情況。故C正確。
考點:考查了社會歷史類閱讀
點評:本文介紹了悉尼歌劇院的歷史和建設(shè)情況,題目設(shè)置方面對細(xì)節(jié)題的考查較多。